INNSCOR CITY STADIUM 3D RENDERS

  • admin
  • 0 Views
  • 0 Comment
  • No tags

[gallery size="large" columns="1" link="none" ids="523,524"]

Read More
17
Jan
2014

JADE PETROL STATION

  • admin
  • 0 Views
  • 0 Comment
  • No tags

Assignment Name: New Petrol Station – Design and Supervision Country: Kenya (Eldoret) Name of Client: JADE PETROLEUM (K) LTD. Duration: 6 Months Start Date: Jan 2012 Completion Date: July 2012 Design , Tender document preparation and evaluation of bids for above project. Supervision and commissioning.

Read More
17
Jan
2014

Upgrade of Western Kenya Pipeline Extension Project- Line 4

  • admin
  • 0 Views
  • 0 Comment
  • No tags

Assignment Name: Upgrade of Western Kenya Pipeline Extension Project- Line 4 Country: Kenya (KPC Nairobi PS 21 to Eldoret KPC PS 27) Name of Client: KENYA PIPELINE CO. Duration: 7 Months Start Date: June 2011 Completion Date: Dec 2011   Electrical and Instrumentation installation supervision. Construction of a parallel 10 inch pipeline to existing Line 2 from Nairobi to Eldoret a total of 326…

Read More
17
Jan
2014

Construction of Fuel storage Depot.

  • admin
  • 0 Views
  • 0 Comment
  • No tags

Assignment Name: Construction of Fuel storage Depot. Country: Kenya (Kipevu, Mombasa) Name of Client: VTTI Duration: 12 Months Start Date: July 2011 Completion Date: June 2012 Elecrical and Instrumentation supervision services up to commissioning. Fuel storage depot designed and partially constructed was taken over by VTTI. Depot comprises of 11 above ground vertical tanks each with tank gauging, High level alarms, and Motorized valves on…

Read More
17
Jan
2013

Greening the Tea Industry (GTIEA)

  • admin
  • 0 Views
  • 0 Comment
  • No tags

Assignment Name: Greening the Tea Industry in East Africa- GTIEA. North Mathioya Hydro Power project Country: Kenya (Eldoret) Name of Client: KENYA TEA DEV. AUTHORITY Duration: 6 Months Start Date: Jan 2012 Completion Date: June 2012 Site survey, design of Step up substation, Distribution system, step down substations at the 4 factories and tie-in to KPLC 33 KV substation near Githambo Tea factory. Designed…

Read More
17
Jan
2013

Proposed LPG storage and bottling facility

  • admin
  • 0 Views
  • 0 Comment
  • No tags

Assignment Name: New Petrol Station – Design and Supervision Country: Uganda (Jinja) Name of Client: TOTAL (U) LTD Duration: 9 Months Start Date: Jan 2010 Completion Date: Sept 2010 Supervised contractor in installation and commissioning. Establishment of a new LPG storage depot comprising of 1x100 T and 1x70 T LPG above ground bullets .with a loading/unloading gantry, Gas detection system, High Level alarm system, Automatic…

Read More
17
Jan
2013

Additional 2 Nos. AGO tanks

  • admin
  • 0 Views
  • 0 Comment
  • No tags

Assignment Name: New Petrol Station – Design and Supervision Country: Kenya (Nairobi) Name of Client: National Oil Corporation of Kenya. Duration: 6 Months Start Date: Nov 2008 Completion Date: Aug 2009   Electrical design, instrumentation configuration and SCADA tie –in to existing. Worked as the Resident Engineers for Mechanical, Electrical and Instrumentation in supervision duties. Main Objectives being; to confirm that all work was carried…

Read More
17
Jan
2013

Electrical works at the New storage depot

  • admin
  • 0 Views
  • 0 Comment
  • No tags

Assignment Name: Electrical works at the New storage depot in Kipevu Mombasa Country: Kenya (Mombasa) Name of Client: Triton (in receivership) Duration: 12 Months Start Date: Jan 2008 Completion Date: Dec 2009   Provided on site supervision for all the above electrical and instrumentation works. Electrical installations works, SCADA installation, Automatic Tank Gauging system, High Level alarm system, Fire alarm and detection system. Area and perimeter lighting,…