Assignment Name: New Petrol Station – Design and Supervision
Country: Kenya (Nairobi)
Name of Client: National Oil Corporation of Kenya.
Duration: 6 Months
Start Date: Nov 2008
Completion Date: Aug 2009
Electrical design, instrumentation configuration and SCADA tie –in to existing.
Worked as the Resident Engineers for Mechanical, Electrical and Instrumentation in supervision duties. Main Objectives being; to confirm that all work was carried to Specifications and Standards as detailed in the design. The following tasks were witnessed in order to achieve this.
The other objective was to vet all Work Procedures as drawn by the contractor to ensure that they are safe and supervise compliance to the same on site.
[gallery size="large" columns="1" link="none" ids="523,524"]
Innscor Highview [gallery size="large" link="none"…
Assignment Name: New Fuel Depot …
Assignment Name: New Petrol Station – Design…
Assignment Name: Kenya Electricity Enhancement Project…
Assignment Name: Upgrade of Western Kenya…
Assignment Name: Construction of Fuel storage Depot.…
Assignment Name: Greening the Tea Industry…
Assignment Name: New Petrol Station – Design…
Assignment Name: New Petrol Station – Design…
Assignment Name: Electrical works at the New…