Assignment Name: Greening the Tea Industry in East Africa- GTIEA. North Mathioya Hydro Power project
Country: Kenya (Eldoret)
Name of Client: KENYA TEA DEV. AUTHORITY
Duration: 6 Months
Start Date: Jan 2012
Completion Date: June 2012
Site survey, design of Step up substation, Distribution system, step down substations at the 4 factories and tie-in to KPLC 33 KV substation near Githambo Tea factory.
Designed a 5 MVA step up substation for the generated power at the Small Hydro power plant near Gatunguru T. Factory
Designed a 5 MVA step up substation for the generated power at the Small Hydro power plant near Gatunguru T. Factory, designed an 20 Km 33 KV distribution network covering 4 factories on project area. Designed a 1 Km 33 KV line to KPLC’s Githambo substation for export of 5 MVA power to National grid.
[gallery size="large" columns="1" link="none" ids="523,524"]
Innscor Highview [gallery size="large" link="none"…
Assignment Name: New Fuel Depot …
Assignment Name: New Petrol Station – Design…
Assignment Name: Kenya Electricity Enhancement Project…
Assignment Name: Upgrade of Western Kenya…
Assignment Name: Construction of Fuel storage Depot.…
Assignment Name: Greening the Tea Industry…
Assignment Name: New Petrol Station – Design…
Assignment Name: New Petrol Station – Design…
Assignment Name: Electrical works at the New…