Home / Greening the Tea Industry (GTIEA)

Assignment Name: Greening the Tea Industry in East Africa- GTIEA. North Mathioya Hydro Power project

Country: Kenya (Eldoret)

Name of Client: KENYA TEA DEV. AUTHORITY

Duration: 6 Months

Start Date: Jan 2012

Completion Date: June 2012

Site survey, design of Step up substation, Distribution system, step down substations at the 4 factories and tie-in to KPLC 33 KV substation near Githambo Tea factory.

Designed a 5 MVA step up substation for the generated power at the Small Hydro power plant near Gatunguru T. Factory

Designed a 5 MVA step up substation for the generated power at the Small Hydro power plant near Gatunguru T. Factory, designed an 20 Km 33 KV distribution network covering 4 factories on project area.  Designed a 1 Km 33 KV line to KPLC’s Githambo substation for export of 5 MVA power to National grid.