Assignment Name: Upgrade of Western Kenya Pipeline Extension Project- Line 4 Country: Kenya (KPC Nairobi PS 21 to Eldoret KPC PS 27) Name of Client: KENYA PIPELINE CO. Duration: 7 Months Start Date: June 2011 Completion Date: Dec 2011 Electrical and Instrumentation installation supervision. Construction of a parallel 10 inch pipeline to existing Line 2 from Nairobi to Eldoret a total of 326…
Read MoreAssignment Name: Greening the Tea Industry in East Africa- GTIEA. North Mathioya Hydro Power project Country: Kenya (Eldoret) Name of Client: KENYA TEA DEV. AUTHORITY Duration: 6 Months Start Date: Jan 2012 Completion Date: June 2012 Site survey, design of Step up substation, Distribution system, step down substations at the 4 factories and tie-in to KPLC 33 KV substation near Githambo Tea factory. Designed…
Read More[gallery size="large" columns="1" link="none" ids="523,524"]
Innscor Highview [gallery size="large" link="none"…
Assignment Name: New Fuel Depot …
Assignment Name: New Petrol Station – Design…
Assignment Name: Kenya Electricity Enhancement Project…
Assignment Name: Upgrade of Western Kenya…
Assignment Name: Construction of Fuel storage Depot.…
Assignment Name: Greening the Tea Industry…
Assignment Name: New Petrol Station – Design…
Assignment Name: New Petrol Station – Design…
Assignment Name: Electrical works at the New…
Recent Comments